Across 80+ production lines we run standard models, modified builds and ground-up new tooling under one roof. This page answers the two questions every buyer asks — can you handle my volume, and how soon do I get my goods — then lets you self-locate your order on the lead-time ladder.

dibibi-factory-cnc-press-brake

DiBiBi Monthly Capacity — Standard Performance Data

We build to order — no goods sit on a shelf. Every order takes a slot in the production queue; smaller standard runs clear fastest. Peak output assumes standard models on continuous run; mixed schedules reduce throughput.

Monthly Output

15K

units / month, peak-rated Injuries

Production Lines

100%

running in parallel

Standard Runrate

3000

units / week per model

DiBiBi Production Lead Time

Lead time steps up with distance from ready tooling. Find the tier your order falls into — the bar shows the relative wait; the trigger line tells you what pushes an order into that tier.

 

5–7 workdays25%
25%

Trigger: a modest standard-series order — roughly 500 units or fewer, existing model and spec. It slots straight into the queue and clears fast, no full-scale run needed.

Standard Product

existing model

7–15 workdays35%
35%

Trigger: existing model, existing mold, existing color and spec. No changes — we just run it through the line.

Modified Product

existing model, changed

15–35 workdays55%
55%

Trigger: an existing model with changes — different color, added hardware, minor dimension tweak. Needs mold/setup adjustment, not new tooling.

Custom Outdoor Sructures

built to your spec

35–55 workdays75%
75%

Trigger: built to your requirements — size, layout, branding — on our existing process capability, but nothing pre-made. A full production cycle from scratch.

New Product Development

new SKU

55-70 workdays90%
90%

Trigger: a genuinely new SKU — new mold tooling, sampling, then testing & validation before mass production. Mold-making alone runs weeks before the first unit.

DiBiBi Product Lines

FAQs

No — everything is built to order. Each order takes a slot in the production queue, so your lead time depends on the tier your order falls into and the current queue, not on shelf availability.

A modest standard-series order — around 500 units or fewer of an existing model — typically clears in 5–7 workdays once it enters the queue.

Around 150,000 units a month across 80+ lines — roughly 3,000 units per week on a single standard model running continuously. Larger accounts are scheduled across multiple lines.

When your specs are confirmed we place the order in line and give you a firm production slot. Higher tiers (modified, custom, new tooling) add setup or mold time before the run begins.

A new SKU needs new mold tooling, sampling and validation before mass production can start. Mold-making alone runs weeks before the first unit is produced.